The visit schedule is on a wall or in a notebook.
A unit is missed in a busy month, and nobody sees it until the customer asks.
Custom Ops Desks · Lift, escalator and hoist maintenance
This guide is for a small contractor in Singapore that maintains lifts, escalators or hoists, with fewer than 10 staff. A Custom Ops Desk is one private browser page or one Excel workbook that WorkflowLab builds around one job. An example is the list of maintenance visits that are due this month. The desk holds each unit, each visit, each call-out job sheet and each contract rate, and it does the arithmetic. It covers one job first. A competent person does each visit and each inspection, and a person sends each invoice.
A small lift contractor often has 2 or 3 teams on the road, a store of spare parts and 1 office clerk. If these 4 points describe your company, a desk can fit.
A unit is missed in a busy month, and nobody sees it until the customer asks.
The technician signs the sheet at the site. The office bills it weeks later.
A door roller is fitted, and the invoice has labour only.
The contract end, the next inspection and the certificate date are in different files.
The risk is not the monthly fee. The risk is the visit that was not done, and the call-out and the part that were not billed.
The table shows what a desk for each job would hold. The written scope names the real fields.
| Candidate job | What a desk for this job would hold | What the person decides |
|---|---|---|
| Visit schedule | Each unit with its visits: planned, done and still owed. | Which team goes where, and when. |
| Date reminders | Each unit with its inspection date, its certificate date and a reminder date. | What to book, and with whom. |
| Call-out job sheets | Each job sheet with the unit, the hours, the parts and the invoice that billed it. | What is chargeable under the contract. |
| Monthly bill check | Each contract with the fee, the units and the call-outs of the month. | What goes on the invoice, and when to send it. |
A contractor that maintains air-conditioning and mechanical systems can read the ACMV and M&E maintenance guide. A contractor that inspects fire and security systems can read the fire safety and security guide.
Add any weekly job that is not in the table.
Note the hours each job takes in 1 normal week, and at month-end.
Mark each visit that was late, and each job sheet that was billed late or not billed.
Choose the job that costs most. That job is the first scope.
Put the other jobs on a dated list.
To turn the hours into an estimate, use the Custom Ops Desk payback calculator. The result is an illustrative estimate from your own figures.
Sample data. Example only. Example Lift Services (sample company) has maintenance contract S-MC-6201 with Customer L (sample), a building owner. The contract covers 6 lifts. In this sample, the contract has 1 visit for each lift in each month, and the fee is S$180.00 for each lift in each month. Your own contract and the rules that apply to you set your own intervals.
| Count | Arithmetic | Result |
|---|---|---|
| Visits in the contract for 1 year | 6 × 12 | 72 |
| Visits done from January to November 2026 | The service reports | 64 |
| Visits planned from January to November 2026 | 6 × 11 | 66 |
| Visits late at the end of November | 66 − 64 | 2 |
| Visits still to do in 2026 | 72 − 64 | 8 |
| Contract fee for 1 month | 6 × S$180.00 | S$1,080.00 |
A desk for the visit schedule would show the 2 late visits with the lift and the month of each one. A person plans the 8 visits that are left: the 2 late visits and the 6 visits of December.
The desk counts service reports. It does not know what a technician did at the lift, and it does not say whether a visit met a rule or a manufacturer's schedule.
Sample data. On Thursday 12 November 2026, a lift at Customer L stops with a door fault. The technician attends and writes job sheet S-JS-7301. In this sample, the contract does not cover call-out labour after office hours or spare parts. The call-out rate is S$95.00 an hour. The sample tax rate is 9%.
| Line on the job sheet | Arithmetic | Amount |
|---|---|---|
| Labour: 3 hours | 3 × S$95.00 | S$285.00 |
| Spare part: 4 door rollers SP-7310 at S$42.00 | 4 × S$42.00 | S$168.00 |
| Value of the job sheet | S$285.00 + S$168.00 | S$453.00 |
A desk for call-out job sheets would show S-JS-7301 as “not billed” until an invoice number is recorded for it. It would also show the 4 rollers that left the store for this job. A person decides what is chargeable, by the terms of the contract.
Sample data. The invoice for November 2026 has the contract fee and the call-out.
| Invoice line | Arithmetic | Amount |
|---|---|---|
| Contract fee for November: 6 lifts | 6 × S$180.00 | S$1,080.00 |
| Call-out job sheet S-JS-7301 | S$285.00 + S$168.00 | S$453.00 |
| Subtotal | S$1,080.00 + S$453.00 | S$1,533.00 |
| Tax | S$1,533.00 × 9% | S$137.97 |
| Total | S$1,533.00 + S$137.97 | S$1,670.97 |
Without the job sheet, the invoice is S$1,080.00 + S$97.20 tax = S$1,177.20. The difference before tax is the S$453.00 of the call-out. A desk for the monthly bill check would show each job sheet of the month beside the invoice. A person checks the list and sends the invoice.
Sample data. For lift number 3 at Customer L, the record in the desk has a certificate end date of 28 February 2027. Example Lift Services wants a reminder 60 days before each such date.
| Date | Arithmetic | Result |
|---|---|---|
| Reminder date | 28 February 2027 minus 60 days is 30 December 2026 | Wednesday 30 December 2026 |
| Days from the reminder to the end date | 30 December 2026 to 28 February 2027 | 60 days |
The desk shows the reminder on its list from Wednesday 30 December 2026. A person books the inspection with the customer and with the person who is allowed to do it. The 60 days are the choice of this sample company. They are not a rule.
The desk holds the dates that a person types in. It does not check a date with an authority, and it does not say which inspection, test or permit a unit needs.
| Customer and site | The customer, the building and the site address. |
|---|---|
| Unit | Your unit number, the type (lift, escalator or hoist) and the contract that covers it. |
| Contract | The contract number, the start and end dates, the visits in a year and the fee. |
| Visit | The date, the team and the file name of the service report. |
| Dates to remember | The inspection date and the certificate date that a person records, with a reminder date. |
| Call-out job sheet | The job sheet number, the date, the hours, the parts and the invoice number. |
| Spare part | The part code, the quantity and the job sheet that used it. |
| Where the paper is | The file name of the contract, the report or the job sheet. |
The desk does not change your service report or your job sheet. If the scope includes it, a reader, which is the AI step, reads the scan of a job sheet into these fields. A person can check every reading against the scan.
This guide is not engineering, safety or regulatory advice. It does not explain the rules of the Building and Construction Authority (BCA) or of any other authority for lifts, escalators or hoists. A desk does not decide whether a unit is safe, how often it must be maintained or inspected, or who is allowed to maintain, examine or certify it. A competent person and the authority decide that. A reminder in a desk does not replace your own duty to know each date.
| Topic | What stays the same | What changes |
|---|---|---|
| Your service reports | Technicians fill in the same reports. | A person records each visit in the desk once. |
| Your job sheets | Technicians and customers sign the same job sheets. | Each job sheet stays on a list until an invoice number is recorded for it. |
| Your invoices | You invoice from your accounting software, as today. | The call-outs of the month are on one list beside the contract fee. |
| Accounting software | Your accounting software stays. | Nothing changes there, unless the written scope names an export layout. |
| Decisions | A person plans each visit and decides each charge. | A person decides from one list, not from a wall chart and a pile of sheets. |
| Your data | Your data stays private to your company. |
|---|---|
| First conversation | The first conversation needs no confidential files. |
| Customer contracts | Say in the workflow walkthrough if a contract or a rate list is under an NDA. |
| Outside AI services | Before any outside AI service reads a file, WorkflowLab asks whether the file is under an NDA. |
| AI readings | Where AI reads documents, a person can check every reading against the source. |
| AI in the desk | A desk does not need AI. A visit count and a reminder date are arithmetic and plain rules. |
AI reads. Plain rules decide. People approve.
Packaged field service software has a technician app, scheduling and a customer portal. It can be the better choice for a company with many teams. The guide Custom Ops Desk vs SaaS vs ERP compares the 3 choices.
There is no public price list for Custom Ops Desks. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
We plan the first useful result within 1 week of the day we receive your sample files. After handover, you run the desk alone, or the first quote names a small monthly support fee.
A desk that includes an AI system may qualify for the Singapore 400% tax deduction for AI spending. Your accountant confirms what qualifies.
Each walkthrough session is at most 30 minutes, on your schedule.
To see the kind of desk WorkflowLab builds, open the equipment rental, billing and maintenance desk. It shows a billing queue for rentals. It uses sample data only, and it is not a lift maintenance desk. A contractor with pest control or cleaning contracts can read the pest control and cleaning guide.
Excel is a trademark of its owner. WorkflowLab is not affiliated with or endorsed by its owner.
Packaged field service software has a technician app, scheduling and a customer portal, and it fits a company with many teams. A Custom Ops Desk is one private browser page or one Excel workbook for one job. It fits a company with fewer than 10 staff where 1 clerk tracks visits and bills.
Count the visits planned to date and take away the visits done. In the sample in this guide, 6 × 11 = 66 visits were planned to the end of November, and 64 were done, so 66 − 64 = 2 visits are late.
Keep each job sheet on a list until an invoice number is recorded for it. In the sample, job sheet S-JS-7301 has a value of S$285.00 + S$168.00 = S$453.00. The bill for the month is S$453.00 lower without it.
Yes. A person records the date, and the desk shows a reminder date. In the sample, 28 February 2027 minus 60 days is 30 December 2026. The desk does not say which inspection a unit needs or when. The authority and a competent person decide that.
No. A desk does the arithmetic on visits, job sheets and rates. It makes no safety decision, and it does not record what a technician checked. A competent person decides.
There is no public price list. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
Send a short email. Name the job, who does it, and what you use today. The first conversation needs no confidential files.
Every demo runs in your browser with sample data. A Custom Ops Desk has no public price list. You get one written scope with one fixed price before any build starts.