The quotation is a calculator and a notebook.
The owner knows the weight for each metre from memory. A new clerk does not.
Custom Ops Desks · Metal and timber stockists
This guide is for a small stockist of steel, timber, sheet metal or hardware in Singapore, with fewer than 10 office staff. A Custom Ops Desk is one private browser page or one Excel workbook that WorkflowLab builds around one job. An example is the costing of a cut-to-size quotation. The desk holds your price table and your weight table, and it does the length and weight arithmetic. It covers one job first. A person sets each price and signs each quotation.
A small stockist often has 1 or 2 people in the office and a few people in the yard. If these 4 points describe your company, a desk can fit.
The owner knows the weight for each metre from memory. A new clerk does not.
The office sends the sizes to the yard by chat. The yard writes them on a board.
The customer compares the two and calls.
A 2-metre offcut is good stock. Nobody knows that it is there.
The risk is not the tools. The risk is that the same order is counted in 3 units, and each paper shows only one of them.
The table shows what a desk for each job would hold. The written scope names the real fields.
| Candidate job | What a desk for this job would hold | What the person decides |
|---|---|---|
| Cut-to-size quotation costing | The item, the cut size, the number of pieces, the stock lengths needed, the weight, your price table and the arithmetic. | The price for each kilogram, the cutting charge and the margin. |
| Cut list for the yard | One line for each cut: item, stock length, cut size, number of pieces and the offcut that is left. | Which stock length to cut first, and when. |
| DO by pieces, length and weight | One line for each delivery: sales order, pieces, total length, weight and who signed. | Whether a delivery is complete, and what to bill. |
| Stock balance with offcuts | Full lengths and sheets by item, and one line for each offcut that is long enough to sell. | What to reorder, and which offcut to use for a new order. |
A company that mainly takes orders by message and delivers from stock can read the industrial trading, marine and hardware guide. A shop that machines or moulds parts can read the precision engineering guide or the plastic moulding job-shop guide.
Add any weekly job that is not in the table.
Note the hours each job takes in 1 normal week.
Mark each quotation or DO that a customer sent back.
Choose the job that costs most. That job is the first scope.
Put the other jobs on a dated list.
To turn the hours into an estimate, use the Custom Ops Desk payback calculator. The result is an illustrative estimate from your own figures.
Sample data. Example only. Example Steel Supplies (sample company) gets a request from Customer F (sample): 12 pieces of 50 × 50 × 3 mm square hollow section, each 1.450 m long. The stock length is 6.000 m. The sample weight table gives 4.25 kg for each metre. The sample saw uses 3 mm for each cut. Your own tables set your own figures.
| Figure | Arithmetic | Result |
|---|---|---|
| Pieces from one stock length | 4 × 1.450 m = 5.800 m | 4 pieces |
| Saw loss on one stock length | 4 cuts × 0.003 m | 0.012 m |
| Length used on one stock length | 5.800 m + 0.012 m | 5.812 m |
| Offcut from one stock length | 6.000 m − 5.812 m | 0.188 m |
| Stock lengths needed | 12 pieces ÷ 4 pieces | 3 lengths |
A fifth piece does not fit: 5 × 1.450 m = 7.250 m, which is more than 6.000 m.
| Figure | Arithmetic | Result |
|---|---|---|
| Stock used | 3 × 6.000 m = 18.000 m, and 18.000 m × 4.25 kg | 76.50 kg |
| Pieces delivered | 12 × 1.450 m = 17.400 m, and 17.400 m × 4.25 kg | 73.95 kg |
| Offcuts | 3 × 0.188 m | 0.564 m |
| Saw loss | 3 × 0.012 m | 0.036 m |
The lengths add up: 17.400 m + 0.564 m + 0.036 m = 18.000 m.
The sample price is S$1.60 for each kilogram of stock used. The sample cutting charge is S$1.50 for each cut. The sample margin is 25% on cost.
| Figure | Arithmetic | Result |
|---|---|---|
| Material cost | 76.50 kg × S$1.60 | S$122.40 |
| Cutting charge | 12 cuts × S$1.50 | S$18.00 |
| Cost | S$122.40 + S$18.00 | S$140.40 |
| Quotation price before GST | S$140.40 × 1.25 | S$175.50 |
A desk for quotation costing would show these 3 steps on one page. The person can change the price for each kilogram, the cutting charge or the margin, and the desk works out the quotation again.
The quotation charges the 3 full lengths: 76.50 kg. The 12 pieces on the lorry weigh 73.95 kg. The difference is 76.50 kg − 73.95 kg = 2.55 kg of offcut and saw loss.
A customer who weighs the delivery sees 73.95 kg and an invoice for 76.50 kg. A desk would print both figures on the quotation and on the DO, with the words “charged by stock length”. Whether you charge the stock length or the cut length is your own rule. The desk follows the rule that the written scope names.
Sample data. The same desk would hold one formula for each kind of stock. The figures are sample figures from a sample weight table.
| Mild steel plate, 2.0 m × 1.0 m × 10 mm | 2.0 × 1.0 × 10 × 7.85 = 157.00 kg for each plate |
|---|---|
| 5 plates at a sample price of S$1.80 for each kilogram | 5 × 157.00 kg = 785.00 kg, and 785.00 × S$1.80 = S$1,413.00 |
| Timber, 50 mm × 100 mm × 3.6 m | 0.05 × 0.10 × 3.6 = 0.018 cubic metres for each piece |
| 40 pieces at a sample price of S$650.00 for each cubic metre | 40 × 0.018 = 0.72 cubic metres, and 0.72 × S$650.00 = S$468.00 |
The figure 7.85 is a common weight for mild steel: kilograms for 1 square metre at 1 mm thick. Other metals and other timbers have other figures. The desk uses the table that you give.
Sample data. The item is the same hollow section, counted in full 6.000 m lengths.
| Movement | Lengths | Balance |
|---|---|---|
| Opening balance | 20 | |
| Received on supplier DO S-DO-8201 | + 30 | 50 |
| Cut for sales order S-SO-6101 | − 3 | 47 |
| Sold as full lengths in the week | − 14 | 33 |
The balance is 20 + 30 − 3 − 14 = 33 lengths. The weight of the balance is 33 × 6.000 m × 4.25 kg = 841.50 kg.
The 3 offcuts of 0.188 m are too short to sell, so the desk would count them as scrap. The written scope names the shortest offcut that goes back into stock. An offcut above that length gets its own line, with its length and its place in the yard.
| Topic | What stays the same | What changes |
|---|---|---|
| Your quotation form | The desk keeps your own Excel quotation layout where you want that. | The lengths, the weights and the price come from one table, with the arithmetic in view. |
| The yard | The yard cuts from a cut list, as today. | The cut list comes from the quotation. Nobody types the sizes a second time. |
| Paper DO | The customer signs the paper DO, as today. | The DO shows the pieces, the total length and the weight on one line. |
| Accounting software | Your accounting software stays. | Nothing changes there, unless the written scope names an export layout. |
| Decisions | A person sets the price, the margin and the delivery date. | A person decides from one page, not from memory. |
| Your data | Your data stays private to your company. |
|---|---|
| First conversation | The first conversation needs no confidential files. |
| Outside AI services | Before any outside AI service reads a file, WorkflowLab asks whether the file is under an NDA. |
| AI readings | Where AI reads documents, a person can check every reading against the source. |
| AI in the desk | A desk does not need AI. A cut list and a weight are arithmetic and plain rules. |
AI reads. Plain rules decide. People approve.
Packaged stock software and ERP systems cover many jobs in one product. They can be the better choice for a company with several branches. The guide Custom Ops Desk vs SaaS vs ERP compares the 3 choices.
There is no public price list for Custom Ops Desks. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
We plan the first useful result within 1 week of the day we receive your sample files. After handover, you run the desk alone, or the first quote names a small monthly support fee.
A desk that includes an AI system may qualify for the Singapore 400% tax deduction for AI spending. Your accountant confirms what qualifies, and the EIS guide gives the rules.
Each walkthrough session is at most 30 minutes, on your schedule.
To see the kind of desk WorkflowLab builds, open the 2 sample desks on the demos page. They use sample data only, and neither one is a stockist desk.
WhatsApp and Excel are trademarks of their owners. WorkflowLab is not affiliated with or endorsed by them.
Packaged stock software and ERP systems cover many jobs and fit a company that can configure and learn a full system. A Custom Ops Desk is one private browser page or one Excel workbook for one job. It fits a company with fewer than 10 office staff where 1 person makes every quotation.
Multiply the total length by the weight for each metre in your weight table. In the sample in this guide, 12 pieces of 1.450 m are 17.400 m, and 17.400 m × 4.25 kg = 73.95 kg. The 3 full stock lengths are 18.000 m, or 76.50 kg.
Divide the stock length by the cut length, with the saw loss, and round down. That is the number of pieces from one length. In the sample, 4 pieces of 1.450 m come from one 6.000 m length, so 12 pieces need 3 lengths.
One paper states the pieces that were delivered. The other states the stock that was used. In the sample, the pieces weigh 73.95 kg and the stock used weighs 76.50 kg. A desk would show both figures on one line.
Yes, if the scope includes the stock balance. Each offcut above a length that you set gets its own line, with its length and its place in the yard. A person decides which offcut to use for a new order.
There is no public price list. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
Send a short email. Name the job, who does it, and what you use today. The first conversation needs no confidential files.
Every demo runs in your browser with sample data. A Custom Ops Desk has no public price list. You get one written scope with one fixed price before any build starts.