The quantity changes every week.
A site takes 400 frames, sends back 250 and asks for 60 more. One contract has many notes.
Custom Ops Desks · Scaffolding, formwork and site equipment hire
This guide is for a small company in Singapore that hires out scaffolding, formwork, props or other site equipment, with fewer than 10 staff. A Custom Ops Desk is one private browser page or one Excel workbook that WorkflowLab builds around one job. An example is the hire bill of each site for the month. The desk holds the delivery notes, the return notes and the day rates, and it does the arithmetic. It covers one job first. A person counts each return, agrees each difference and sends each invoice.
A small hire company often has thousands of loose items, a yard, a lorry and 1 or 2 office staff. If these 4 points describe your company, a desk can fit.
A site takes 400 frames, sends back 250 and asks for 60 more. One contract has many notes.
A person counts the days between the notes for each item, for each site, every month.
The site foreman writes 145. Your yard counts 138.
Bent and missing items are found when the job ends, months after the delivery.
The risk is not the day rate. The risk is the days that nobody billed, and the items that left the yard and did not come back.
The table shows what a desk for each job would hold. The written scope names the real fields.
| Candidate job | What a desk for this job would hold | What the person decides |
|---|---|---|
| Items on site | Each site with the quantity of each item: delivered, returned and still on site. | When to ask a site for a count, and when to collect. |
| Day-rate hire billing | Each period between 2 notes, with the quantity on site, the days and the rate. | What goes on the invoice, and when to send it. |
| Return-note differences | Each return with the count on the note and the count in the yard. | Which count to accept, after a talk with the site. |
| Loss and damage list | Each item that is missing, bent or cut when the job ends. | What to charge, by the terms of the contract. |
A company that hires out machines by the month can read the forklift and machinery rental guide. A company that hires out generators and compressors can read the generator and compressor rental guide.
Add any weekly job that is not in the table.
Note the hours each job takes in 1 normal week, and at month-end.
Mark each invoice that a customer disputed, and each return where the 2 counts differed.
Choose the job that costs most. That job is the first scope.
Put the other jobs on a dated list.
To turn the hours into an estimate, use the Custom Ops Desk payback calculator. The result is an illustrative estimate from your own figures.
Sample data. Example only. Example Site Hire (sample company) hires scaffold frames to Customer N (sample), a building contractor. In this sample, the rate is S$0.12 for each frame for each day, and the day of a return is not billed. Your own contract sets your own rate and rule.
| Note | Date | Frames |
|---|---|---|
| Delivery note S-DN-4401 | Monday 2 November 2026 | 400 delivered |
| Return note S-RN-4410 | Monday 16 November 2026 | 250 returned |
| Return note S-RN-4418 | Thursday 26 November 2026 | 138 returned, by the yard count |
| Period | Days | Frames on site | Arithmetic | Hire |
|---|---|---|---|---|
| 2 November 2026 to 16 November 2026 | 14 days | 400 | 400 × 14 × S$0.12 | S$672.00 |
| 16 November 2026 to 26 November 2026 | 10 days | 150 | 150 × 10 × S$0.12 | S$180.00 |
| Total for the 2 periods | 24 days | S$672.00 + S$180.00 | S$852.00 |
After the first return, the site holds 400 − 250 = 150 frames. A desk for day-rate hire billing would work out each period from the notes. A person checks the 3 notes and sends the invoice.
Sample data. On return note S-RN-4418, the site foreman wrote 145 frames. Your yard counted 138 frames from the lorry.
| Count | Arithmetic | Result |
|---|---|---|
| Frames on the return note | The note, signed at the site | 145 |
| Frames in the yard count | The count sheet of the yard | 138 |
| Difference | 145 − 138 | 7 |
| Frames still on site, by the yard count | 400 − 250 − 138 | 12 |
| Frames still on site, by the return note | 400 − 250 − 145 | 5 |
The 2 counts give 2 answers: 12 frames on site, or 5. A desk for return-note differences would show this return with a difference of 7, the 2 notes and the photo of the load, if there is one. A person calls the site on the same day.
The desk does not decide which count is right. A person agrees the count with the customer. After that, the person records the agreed count and the reason.
Sample data. On Friday 27 November 2026, the customer and Example Site Hire agree the yard count. 12 frames are still on site.
| Count | Arithmetic | Result |
|---|---|---|
| Hire for the 12 frames, for each day that they stay | 12 × S$0.12 | S$1.44 |
| Hire for the 12 frames to the end of November: 4 days | 12 × 4 × S$0.12 | S$5.76 |
| Hire for November | S$852.00 + S$5.76 | S$857.76 |
The 4 days are 26, 27, 28 and 29 November 2026. In this sample, the frames go back on 30 November 2026, and the day of a return is not billed.
If the 12 frames do not come back, the contract can have a loss charge. In this sample, the loss charge is S$38.00 for each frame: 12 × S$38.00 = S$456.00. A desk would show the 12 frames and the charge. A person decides whether to bill it, by the terms of the contract.
| Customer and site | The customer, the project and the site address. |
|---|---|
| Item | Your item code, the name and the day rate in the contract. |
| Delivery note | The note number, the date and the quantity of each item. |
| Return note | The note number, the date, the quantity on the note and the quantity in the yard count. |
| Agreed count | The count that a person agreed with the site, and the reason. |
| On site | The quantity of each item on site for each day, from the notes. |
| Loss and damage | Each item that is missing or damaged, with the date and the photo file. |
| Where the paper is | The file name of the note, the count sheet or the photo. |
The desk does not change your delivery note or your return note. If the scope includes it, a reader, which is the AI step, reads the scan of a note into these fields. A person can check every reading against the scan.
This guide is not safety advice. It does not explain the rules for scaffolds, formwork, lifting or work at height. A desk does not decide whether a scaffold is safe, who can erect or inspect it, or whether an item is fit for use. A qualified person decides that.
| Topic | What stays the same | What changes |
|---|---|---|
| Your delivery and return notes | Drivers and foremen sign the same notes. | A person records each note in the desk once, with the yard count. |
| Your yard count | Your yard counts each return, as today. | A difference from the return note shows on the same day, not at month-end. |
| Your invoices | You invoice from your accounting software, as today. | The days and the quantities come from the notes, not from a hand count. |
| Accounting software | Your accounting software stays. | Nothing changes there, unless the written scope names an export layout. |
| Decisions | A person agrees each count and each charge. | A person decides from one list, not from a pile of notes. |
| Your data | Your data stays private to your company. |
|---|---|
| First conversation | The first conversation needs no confidential files. |
| Customer contracts | Say in the workflow walkthrough if a contract or a rate list is under an NDA. |
| Outside AI services | Before any outside AI service reads a file, WorkflowLab asks whether the file is under an NDA. |
| AI readings | Where AI reads documents, a person can check every reading against the source. |
| AI in the desk | A desk does not need AI. A quantity on site and a day count are arithmetic and plain rules. |
AI reads. Plain rules decide. People approve.
Packaged hire software has item tracking, a yard module and a customer portal. It can be the better choice for a company with 2 or more yards. The guide Custom Ops Desk vs SaaS vs ERP compares the 3 choices.
There is no public price list for Custom Ops Desks. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
We plan the first useful result within 1 week of the day we receive your sample files. After handover, you run the desk alone, or the first quote names a small monthly support fee.
A desk that includes an AI system may qualify for the Singapore 400% tax deduction for AI spending. Your accountant confirms what qualifies.
Each walkthrough session is at most 30 minutes, on your schedule.
To see the kind of desk WorkflowLab builds, open the equipment rental, billing and maintenance desk. It shows a billing queue for rentals. It uses sample data only, and it is not a scaffolding desk. A subcontractor that claims progress payments can read the subcontractor progress claim guide.
Excel is a trademark of its owner. WorkflowLab is not affiliated with or endorsed by its owner.
Packaged hire software has item tracking, a yard module and a customer portal, and it fits a company with 2 or more yards. A Custom Ops Desk is one private browser page or one Excel workbook for one job. It fits a company with fewer than 10 staff where 1 person works out the hire bills.
Split the month into periods between the notes. In each period, multiply the quantity on site by the days and by the day rate. In the sample in this guide, 400 × 14 × S$0.12 = S$672.00 and 150 × 10 × S$0.12 = S$180.00.
Record the 2 counts on the day of the return, and call the site on the same day. In the sample, the note says 145 and the yard counts 138, so the difference is 7 frames. A person agrees the count with the customer and records the reason.
Add the deliveries and take away the agreed returns, item by item. In the sample, 400 − 250 − 138 = 12 frames are still on site by the yard count.
No. A desk does the arithmetic on notes, days and rates. It makes no safety decision, and it does not record an inspection. A qualified person decides.
There is no public price list. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.
Send a short email. Name the job, who does it, and what you use today. The first conversation needs no confidential files.
Every demo runs in your browser with sample data. A Custom Ops Desk has no public price list. You get one written scope with one fixed price before any build starts.