Custom Ops Desks · Solar PV and electrical switchboards

One private desk for milestone claims, site material and handover papers in a small solar PV or switchboard contractor.

This guide is for a small contractor in Singapore that installs commercial rooftop solar photovoltaic (PV) systems or builds and installs electrical switchboards, with fewer than 10 staff. A Custom Ops Desk is one private browser page or one Excel workbook that WorkflowLab builds around one job. An example is the next milestone claim of each project. The desk holds the contract milestones, the material issued to each site, the list of test sheets and the visits after handover, and it does the arithmetic. It covers one job first. A licensed electrical worker (LEW) does the electrical work that the law gives to a LEW, and a person sends each claim.

In short

  • A Custom Ops Desk is for a small Singapore company: fewer than 10 staff and less than S$10M revenue.
  • A project is paid in milestones. Each milestone has a condition, such as material on site or a signed test sheet.
  • Panels, cable and breakers leave your store on delivery orders (DOs). The quantity on site must agree with the quantity in the design.
  • A handover needs a set of papers. A claim often waits because 1 test sheet is missing.
  • After handover, the contract can have warranty or operation and maintenance (O&M) visits for years.
  • The desk does the arithmetic and the matching. A person makes each decision.
  • A desk makes no electrical or safety decision. It does not check a design, a test result or a licence.

How the work runs today

A small PV or switchboard contractor often has 3 to 6 projects at one time, 1 or 2 site teams and 1 office clerk. If these 4 points describe your company, a desk can fit.

The claim is late.

The material reached the site 3 weeks ago. Nobody sent the milestone claim, because the DOs were not in one place.

Material goes to the wrong project.

24 panels for site A are used at site B. The count for each site is wrong at handover.

One paper stops the handover.

9 test sheets are signed. The last 1 is in a technician's van.

Visits after handover are forgotten.

The contract has 2 visits a year for 5 years. The team remembers the first year.

The risk is not the contract price. The risk is the claim that goes out late, and the material that cannot be traced to a project.

Four jobs that can be the first job

The table shows what a desk for each job would hold. The written scope names the real fields.

Candidate jobWhat a desk for this job would holdWhat the person decides
Milestone claimsEach project with its milestones, the condition of each one and the claim that billed it.When a condition is met, and when to send the claim.
Material issued to siteEach item with the quantity in the design, on each DO and still in the store.What to send, move or bring back.
Handover paper listEach paper that the handover needs, and whether the signed copy is in the file.Whether the set is complete.
Warranty and O&M visitsEach site with its visits: planned, done and still owed.Which team goes, and when.

A subcontractor that claims progress payments by percentage can read the subcontractor progress claim guide. A contractor that maintains lifts and escalators can read the lift and escalator maintenance guide.

How to pick the first job

  1. Write the jobs on one page

    Add any weekly job that is not in the table.

  2. Count the hours

    Note the hours each job takes in 1 normal week, and at month-end.

  3. Count the misses

    Mark each claim that went out late, and each handover that waited for a paper.

  4. Name one job

    Choose the job that costs most. That job is the first scope.

  5. Date the others

    Put the other jobs on a dated list.

To turn the hours into an estimate, use the Custom Ops Desk payback calculator. The result is an illustrative estimate from your own figures.

Example: the milestones of one contract

Sample data. Example only. Example Solar Works (sample company) installs a rooftop PV system for Customer V (sample), a factory owner. Contract S-CT-8101 has a price of S$86,000.00 and 4 milestones. The sample tax rate is 9%. Your own contract sets your own milestones.

MilestoneCondition in the contractArithmeticAmount
1Contract signed20% × S$86,000.00S$17,200.00
2Panels and inverters delivered to the site50% × S$86,000.00S$43,000.00
3Testing and commissioning complete, handover papers signed25% × S$86,000.00S$21,500.00
4End of the 12-month defects period5% × S$86,000.00S$4,300.00

The 4 milestones add up to the contract price: S$17,200.00 + S$43,000.00 + S$21,500.00 + S$4,300.00 = S$86,000.00.

The claim for milestone 2 is S$43,000.00 + S$3,870.00 tax = S$46,870.00. A desk for milestone claims would show milestone 2 as “condition met, not claimed” from the day that the last DO for panels and inverters is signed. A person checks the DOs and sends the claim.

Example: material issued to the site

Sample data. The design for S-CT-8101 has 160 panels, 12 DC isolators and 9 drums of DC cable. The store issues material to the site on 3 DOs.

DODatePanelsDC isolatorsCable drums
S-DO-8201Monday 4 January 202764124
S-DO-8202Monday 11 January 20276403
S-DO-8203Friday 15 January 20272400
CountArithmeticResult
Panels issued to the site64 + 64 + 24152
Panels still to issue160 − 1528
Cable drums issued to the site4 + 37
Cable drums still in the store9 − 72
DC isolators still to issue12 − 120

The condition of milestone 2 is that the panels and the inverters are on the site. With 152 of 160 panels issued, the condition is not met by the DOs. A desk for material would show the 8 panels that are missing. A person decides when to send them, and whether to claim before that. The desk does not decide what the contract allows.

Example: the handover paper list

Sample data. For this sample project, Example Solar Works lists 10 papers for the handover of S-CT-8101. The list is the choice of this sample company. Your contract, your LEW and the rules that apply to you set your own list.

CountArithmeticResult
Papers on the listThe handover list10
Signed papers in the file on Friday 5 February 2027The file8
Papers that are missing10 − 82

In this sample, the 2 missing papers are the insulation resistance test sheet for string 6 and the signed as-built single-line drawing. A desk for the handover paper list would show the 2 names and who holds each one. Milestone 3, S$21,500.00, waits for them.

The desk checks that a file is there. It does not read a test value, and it does not say whether a result passes. A LEW does the tests and signs the sheets.

Example: visits after handover

Sample data. The contract has 2 O&M visits in each year for 5 years, at S$450.00 for each visit.

CountArithmeticResult
Visits in the contract2 × 510
Fee for 1 year2 × S$450.00S$900.00
Fee for the 5 years10 × S$450.00S$4,500.00
Visits done at the end of year 2The visit reports3
Visits late at the end of year 24 − 31

By the end of year 2, the contract has 2 × 2 = 4 visits. A desk for O&M visits would show the 1 visit that is late, with the site and the half-year. A person plans it.

What the desk holds

Customer and siteThe customer, the project and the site address.
ContractThe contract number, the price, each milestone and its condition.
ClaimThe claim number, the milestone, the amount and the date sent.
Design quantityThe quantity of each item in the design: panels, inverters, isolators, breakers and cable drums.
Delivery orderThe DO number, the date, the items, the quantities and whether the signed copy is in the file.
Handover paperThe name of each paper on your list, who holds it and the file name of the signed copy.
Visit after handoverThe date, the team and the file name of the visit report.
Where the paper isThe file name of the contract, the DO or the test sheet.

The desk does not change your DO, your claim or your test sheet. If the scope includes it, a reader, which is the AI step, reads the scan of a signed DO into these fields. A person can check every reading against the scan.

This guide is not electrical, safety or regulatory advice. It does not explain the rules of the Energy Market Authority (EMA), the licensing of electrical workers or the conditions of a grid connection. A desk does not design a system, check a test result, or decide who is allowed to do or to sign electrical work. A licensed electrical worker (LEW) and the authority decide that. A paper list in a desk does not replace the judgment of your LEW.

What changes and what does not

TopicWhat stays the sameWhat changes
Your contractsYou agree the milestones with each customer, as today.A person records the milestones and their conditions in the desk once.
Your DOsDrivers and site staff sign the same DOs.A person records each DO in the desk against 1 project.
Your test sheetsYour LEW tests and signs, as today.Each paper stays on a list until the signed copy is in the file.
Your claimsYou invoice from your accounting software, as today.Each milestone shows whether its condition is met and whether it is claimed.
DecisionsA person decides each claim and each handover.A person decides from one list, not from 4 folders.

Data and privacy

Your dataYour data stays private to your company.
First conversationThe first conversation needs no confidential files.
Customer contracts and drawingsSay in the workflow walkthrough if a contract or a drawing is under an NDA.
Outside AI servicesBefore any outside AI service reads a file, WorkflowLab asks whether the file is under an NDA.
AI readingsWhere AI reads documents, a person can check every reading against the source.
AI in the deskA desk does not need AI. A milestone amount and a material count are arithmetic and plain rules.

What a desk does not do

AI reads. Plain rules decide. People approve.

  • A desk is not project software. It has no programme chart, no drawings and no monitoring of a PV system.
  • A desk does not size a system, a cable or a breaker, and it does not check a design.
  • A desk does not read a test value, and it does not say whether a result passes.
  • A desk does not send a claim, a notice or a form to a customer or to an authority.
  • A desk does not decide what a contract or a warranty covers.
  • A desk does not make a safety decision or a compliance decision.
  • A desk covers one job. It is not a full business system.

Packaged project software has programmes, cost control and document control. It can be the better choice for a company with many projects at one time. The guide Custom Ops Desk vs SaaS vs ERP compares the 3 choices.

Price, delivery and the walkthrough

There is no public price list for Custom Ops Desks. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.

We plan the first useful result within 1 week of the day we receive your sample files. After handover, you run the desk alone, or the first quote names a small monthly support fee.

A desk that includes an AI system may qualify for the Singapore 400% tax deduction for AI spending. Your accountant confirms what qualifies. Read the EIS 400% tax deduction guide.

What to prepare for the workflow walkthrough

Each walkthrough session is at most 30 minutes, on your schedule.

  • Name the 1 job that costs most, and who does it.
  • Count your projects in progress and your sites under a warranty or an O&M contract.
  • Bring 1 contract without the customer name, with its milestones.
  • Bring 1 blank DO and your own handover paper list.
  • Choose 1 project that you can follow from the contract to the handover.
  • Note which files are under an NDA.

To see the kind of desk WorkflowLab builds, open the equipment rental, billing and maintenance desk. It shows a billing queue for rentals. It uses sample data only, and it is not a solar PV desk. A contractor with air-conditioning and mechanical maintenance contracts can read the ACMV and M&E maintenance guide.

Excel is a trademark of its owner. WorkflowLab is not affiliated with or endorsed by its owner.

Questions about a desk for a solar PV or switchboard contractor

What software fits a small solar PV or switchboard contractor in Singapore?

Packaged project software has programmes, cost control and document control, and it fits a company with many projects at one time. A Custom Ops Desk is one private browser page or one Excel workbook for one job. It fits a company with fewer than 10 staff where 1 clerk tracks claims and papers.

How do we know when a milestone can be claimed?

Write the condition of each milestone beside its amount, and record the paper that proves it. In the sample in this guide, milestone 2 is 50% × S$86,000.00 = S$43,000.00, and its condition is that the panels and the inverters are on the site.

How do we track panels and cable that go to each site?

Record each DO against 1 project, and compare the total with the design. In the sample, 64 + 64 + 24 = 152 panels are issued, and the design has 160, so 160 − 152 = 8 panels are still to issue.

Can a desk tell us if the handover papers are complete?

A desk shows which papers on your own list have a signed copy in the file. In the sample, 8 of 10 papers are in the file, so 10 − 8 = 2 are missing. The desk does not say what the list must hold. Your LEW and your contract decide that.

Does a desk check an electrical test result?

No. A desk checks that a signed sheet is in the file. It does not read a test value, and it makes no electrical or safety decision. A licensed electrical worker does the tests and signs.

How much does a desk for a small PV or switchboard contractor cost?

There is no public price list. After the workflow walkthrough, you get one written scope with one fixed price. Work starts only after you accept the scope.

Describe the job your team does every week.

Send a short email. Name the job, who does it, and what you use today. The first conversation needs no confidential files.

Every demo runs in your browser with sample data. A Custom Ops Desk has no public price list. You get one written scope with one fixed price before any build starts.